I can't believe I've barely posted this month. I feel like such a slacker. In my defense, I got tied up reading... you still alive? I know, I say i'm going to read more and then I don't, and when I don't post, it's cause I'm actually reading. I can't believe I got pulled into this whole Twilight series. I really didn't care for the first book but really liked two and three. Reading the fourth now and wish it ended like 300 pages ago.
Anyhow, onto the update:
1. Walk/Run 30 miles (8)
2. Cook 15 meals a week (6)
3. Save 60% on our grocery bills (61.38%)
4. Do one craft project -- build ottoman top for fire pit. Haven't started that yet but might change it to something else.
5. Order and install Fan for media room (bought fan and called people to come install it)
6. Go to the gym 4 times during the work day (ummm....)
7. Go for a picnic and a hike (perhaps this weekend, the weather is getting a little better, if you don't count today's thunderstorms.)
8. Go swimming twice at the gym (....)
9. Rain Gutters: measure house, create cost sheet, map out where rain barrels will go. (still need to do this)
10. Buy drip irrigation system and start putting it together (bought another soaker hose, need to finish the last tier before I add this onto the one we have)
11. Make apricot jam (got the apricots in the freezer, hopefully I'll have some time to do this this weekend)
12. Build trellis for grapes (Must do this in the next 2 weeks, there are leaves on the grape vine now!)
13. Finish last tier of the garden (slated for june 20)
14. Start planning Christmas in July BBQ! (haven't started yet but am DYING to have a dinner party)
Tuesday, June 16, 2009
Friday, June 5, 2009
Fruits of our Labor
Little Ringo
Our little Ringo went through the ringer yesterday. On top of going to the Vet for his annual, he got lots of shots too! Then when I got home, the hubby gave him a bath and gave him a summer cut! (this was the first time we did that... took longer than we thought but overall, not too bad) Now our little boy looks skinny (somewhat) again.
Before:

Yes, he is resting his head on a bone pillow.

Ringo and Bruno (who DESPERATELY needs a cut too!)
The Red-eye feature makes their eyes look weird. haha!
After:

That last photo reminds me of a cross between a koala and a st. bernard for some reason.
Happy Friday!
Before:
Yes, he is resting his head on a bone pillow.
Ringo and Bruno (who DESPERATELY needs a cut too!)
The Red-eye feature makes their eyes look weird. haha!
After:
That last photo reminds me of a cross between a koala and a st. bernard for some reason.
Happy Friday!
Tuesday, June 2, 2009
Random thoughts
Monday, June 1, 2009
Things to do before JUL 09
1. Walk/Run 30 miles ()
2. Cook 15 meals a week ()
3. Save 60% on our grocery bills (this month we need to do a little bit of stocking up... hmmm...)
4. Do one craft project -- build ottoman top for fire pit.
5. Order and install Fan for media room
6. Go to the gym 4 times during the work day (ummm....)
7. Go for a picnic and a hike
8. Go swimming twice at the gym (....)
9. Rain Gutters: measure house, create cost sheet, map out where rain barrels will go.
10. Order drip irrigation system and start putting it together
11. Make apricot jam
12. Build trellis for grapes
13. Finish last tier of the garden
14. Start planning Christmas in July BBQ!
2. Cook 15 meals a week ()
3. Save 60% on our grocery bills (this month we need to do a little bit of stocking up... hmmm...)
4. Do one craft project -- build ottoman top for fire pit.
5. Order and install Fan for media room
6. Go to the gym 4 times during the work day (ummm....)
7. Go for a picnic and a hike
8. Go swimming twice at the gym (....)
9. Rain Gutters: measure house, create cost sheet, map out where rain barrels will go.
10. Order drip irrigation system and start putting it together
11. Make apricot jam
12. Build trellis for grapes
13. Finish last tier of the garden
14. Start planning Christmas in July BBQ!
Green goals for the Summer
After talking to the hubby how to lower our bills and become more Eco friendly, we made five goals for the summer.
1. Insulation: we have about 15-20 recessed lights. Last time I was in the attic I noticed how many spots where hot or cold air can seep through them, wasting it. By insulating them, we'll be able keep our electricity bill down more and keep the house at a temp we like.
2. Fans: we are going to add a few ceiling fans to circulate air and hopefully keep the ac off longer.
3. Rain gutters and rain barrels: two winters down and many more to go. Every winter it's rained enough to leave huge puddles. Some storms it feels like our house is an ark. By putting in gutters, we can move the water into rain barrels and then be able use that water for the garden.
4. Solar tunnel: our master bedroom closet is dark dark! We always loved the idea of sun lights. With solar tunnels, it moves the sunlight through the tunnel and light up the area and not cost us a dime! (this one is a maybe)
5. Drip irrigation: we hand water about 75% of the garden. It doesn't seem like much but we're talking 20-30 minutes at a time. It's a good way to not waste water but wastes our time. Putting one on a timer will keep water usage at a minimum and save us time.
Due Date August 15, 2009
How will you try to become more Eco friendly than you are now?
1. Insulation: we have about 15-20 recessed lights. Last time I was in the attic I noticed how many spots where hot or cold air can seep through them, wasting it. By insulating them, we'll be able keep our electricity bill down more and keep the house at a temp we like.
2. Fans: we are going to add a few ceiling fans to circulate air and hopefully keep the ac off longer.
3. Rain gutters and rain barrels: two winters down and many more to go. Every winter it's rained enough to leave huge puddles. Some storms it feels like our house is an ark. By putting in gutters, we can move the water into rain barrels and then be able use that water for the garden.
4. Solar tunnel: our master bedroom closet is dark dark! We always loved the idea of sun lights. With solar tunnels, it moves the sunlight through the tunnel and light up the area and not cost us a dime! (this one is a maybe)
5. Drip irrigation: we hand water about 75% of the garden. It doesn't seem like much but we're talking 20-30 minutes at a time. It's a good way to not waste water but wastes our time. Putting one on a timer will keep water usage at a minimum and save us time.
Due Date August 15, 2009
How will you try to become more Eco friendly than you are now?
Things to do before JUN 09 -- Final Update
1. Walk/Run 30 miles (30)
2. Cook 15 meals a week (15)
3. Save 60% on our grocery bills (71.46% lowest grocery bill of the year= $108.67!!)
4. Do one craft project (worked on a bouquet for a friend! )
5. Clean my bike and go riding (stuff came up... booo)
6. Go to the gym 4 times during the work day (ummm....)
7. Go for a picnic and a hike (lost all the weekends somehow)
8. Go swimming twice at the gym (....)
9. Do boot camp ONCE ()
10. Work out 4 times a week ALL month (i should really just scrap this one. it sounds great but i never do it)
11. Read a book (read lots but never finished it... almost done )
12. Build stairs in the garden instead of my "stepping bricks" i have. (Built but am thinking I may need to make them bigger to step on. I almost fell off the other day)
13. Map out rest of the garden and start building it. (done)
2. Cook 15 meals a week (15)
3. Save 60% on our grocery bills (71.46% lowest grocery bill of the year= $108.67!!)
4. Do one craft project (worked on a bouquet for a friend! )
5. Clean my bike and go riding (stuff came up... booo)
6. Go to the gym 4 times during the work day (ummm....)
7. Go for a picnic and a hike (lost all the weekends somehow)
8. Go swimming twice at the gym (....)
9. Do boot camp ONCE ()
10. Work out 4 times a week ALL month (i should really just scrap this one. it sounds great but i never do it)
11. Read a book (read lots but never finished it... almost done )
12. Build stairs in the garden instead of my "stepping bricks" i have. (Built but am thinking I may need to make them bigger to step on. I almost fell off the other day)
13. Map out rest of the garden and start building it. (done)
Subscribe to:
Posts (Atom)